 ...EMC2 Computer Systems UK projects include


  2007 2006 2005 2004 2003 2002 2001 2000    select year for a sample of projects

 
 

 

Skipton Building Society – Disaster Recovery project. Designed and wrote bespoke automation scripts using VBScript for Unisys ES7000 servers running Windows 2000 & MSCS Cluster. Scripts perform dynamic calculations to determine the correct failover mechanism for a complex SRDF Cluster configuration and directly manipulate the EMC2; SAN, Symmetrix and Clariion configuration

Lovells - Provided design consultancy and technical approval for proposed backup solution using EMC2; TimeFinder, SRDF Multi-Hop and ResourcePak for Windows 2000/2003 & Exchange 2000/2003

BT Ignite – "Interchange 2000" Disaster Recovery testing and in-depth diagnosis of Windows 2000, Symmetrix, SAN performance related problems

BP - Global Datacentre consolidation project. Designed and implemented Exchange 2003 Cluster system backups using EMC2; TimeFinder, SRDF & ResourcePak integration with Microsoft VSS. Additionally provided problem diagnosis and integration with Veritas NetBackup via custom written scripts

Marks And Spencer - Project Management for all M&S projects involving EMC products between 2002 and 2008

 

 

BP - Provided consultancy regarding backup performance problems and tape library configuration advice

MBNA – Conducted workshop and developed TimeFinder based backup solution using custom written scripts

Metropolitan Police (Computacenter) - Provided consultancy and developed Disaster Recovery automated failover processes and procedures using EMC2; SRDF for MSCS Clustered Windows 2000 and Veritas Clustered Solaris servers running Oracle RAC

BT NHS – Consultancy input to design process and development of TimeFinder/SRDF recovery procedures

BP - Forming part of the EMC2; managed service team, providing VMware operational services. Installing, configuring and maintaining of VMware platforms. Consolidate new servers into virtual platform, monitor day to day performance and operation of virtual platforms and diagnose resolve any problems that may occur. Achieved high availability service standards set by BP. Analyzed and recommended further improvements to the design

Centrica - Project management for all EMC projects between 2002 and 2006

 
 

 ...exceed customer expectations


“safeto have successfully transformed our single issue network to a Total Office Solution”

 